FROM THE PROJECT TO THE REALIZATION

Founded to meet the growing requests for special lifting machines in the industrial environment, the company has found development in the nuclear sector since the 90s with the first patents related to the containment of nuclear waste to become today among the leading companies in the decommissioning sector in Italy.

FUCINA ITALIA carries out the design, manufacture and assembly of steel machinery, cranes and lifting equipment, patented sleepers and accessories for cellulose handling in the port area, pressure vessels, containers for radioactive waste, heavy carpentry, as well as mechanical processing, maintenance of lifting equipment and industrial machines and plants.

Thanks to the collaboration with companies specialized in various sectors, we can provide complete systems with hydraulic, pneumatic, electrical and automated parts managed by computers and / or PLCs.

In recent years, the market has led FUCINA ITALIA to deal with foreign companies: special systems and cranes have been supplied and put into operation all over the world.

Storia Fucina

1990

SIDERPIOMBINO FOUNDATION

Specialized Lifting Equipment for Industry.

Patent for Radioactive Waste Containment Systems.

2017

FUCINA ITALIA FOUNDATION

New Shareholder Structure
First Capital Increase
Lease of Siderpiombino’s Business Unit
Investment in Sicomor

2018

NEW CORPORATE STRUCTURE

Griecam acquires 70% of Fucina Italia’s shares; the remaining 30% goes to SRS.

The company has an initial team of 16 employees.

2019

RESTRUCTURING AND GROWTH

The plan to modernize the production facilities is underway.

Thanks to the new hires, the workforce has grown to about 35 employees.

2020

CORPORATE ACQUISITION

MAD Management S.r.l. acquires 70% of the shares from Griecam.

The purchase of the first lot of the company’s assets from the bankruptcy trustees is completed.

The number of employees rises to 42.

2021

INCREASE IN PRODUCTION

The company is ramping up production, and its workforce has grown to 46 employees.

2022

REAL ESTATE EXPANSION

Business consolidation and structural expansion through the purchase of Lot 2 (warehouses) and Lot 3 (11,000 square meters of buildable land in the Montegemoli PIP zone).

The team grows to 55 employees.

2023

NEWCLEO’S ENTRANCE

Newcleo acquires MAD Management’s shares, launching a major industrial efficiency initiative.

The workforce now totals 56 employees

2024

THE YEAR OF THE TURNING POINT

A record year for investments and production volumes, supported by a team that has grown to 60 employees.

2025

CONSOLIDATION AND MAJOR PROJECTS

Strong growth and strategic support for Newcleo in the manufacture of components for Othello and Precursor.

Production revenue has reached approximately 11 million euros, with the workforce growing to 75 employees.

WE WORK "IN QUALITY"

The FUCINA ITALIA quality system is present and regulates all the activities carried out in the company with the aim of defining and optimizing each business process, guaranteeing:

  • Reduction of errors / unexpected events
  • Traceability, archiving and easy accessibility to documentation
  • Reduction of occupational risks
  • Accurate planning of business processes
  • Active control at every stage of the order
  • High quality standards
  • Guarantee of the finished product
  • Ethical / moral respect
  • Economic and motivational satisfaction

Essential requirements to ensure the high quality standards set are:

  • Competence and high level of professionalism of employees thanks to continuous and targeted training and updating.
  • Use of state-of-the-art industrial tools and machinery
  • Certified high quality of all purchased materials
  • Periodic checks and reviews on the state of the quality system to ensure continuous improvement of the organization

ACTUALITY'

The Integrated System of FUCINA ITALIA is structured according to the process approach that incorporates the PLAN-DO-CHECK-ACT (PDCA) cycle and Risck-Based Thinking.

In order to implement the Quality System in the best possible way and guarantee product conformity, the Quality Assurance Office (GdQ) operates, whose manager is a 2nd level certified for non-destructive tests in the methods VT, MT, PT, RT- L assisted by a testing officer and supported by the external Welding Coordinator having level III on VT, PT, MT, RT, UT, UTTOFD and Phased Array, TT.

The Quality office is equipped with all the necessary equipment for assessing the quality of the product, the inbound tests and those during the various stages of processing as well as staff training.

The quality of the finished product is guaranteed by the Quality Control system and by the presence in the Company of certified personnel.

The company also has equipment and qualified personnel for performing non-destructive tests in the VT, PT, MT and RT-L methods.

CONSOLIDATED EXCELLENCE

The Quality Management System adopted by Fucina Italia is certified in compliance with the UNI-EN ISO 9001 standards.

The construction of the steel structures is certified in accordance with the UNI-EN 1090 standard

All the activities and all the latest machines purchased are connected and communicate fully with the company management system; essential requirements for the gradual transformation into “ INDUSTRY 4.0 “

A fundamental aspect for FUCINA ITALIA is respect for and protection of the environment, of people and particular attention is paid to the Health and Safety management system; intentions respected and formalized with the acquisition of the UNI-EN ISO 14001 and UNI-EN ISO 45001 certifications

Welding is one of the most important activities for the sectors in which we operate (steel structures, lifting and handling machines and equipment, pressure vessels, boiler works, decommissioning and radioactive material storage) and is therefore a of the most regulated and controlled stages of production. The certificate relating to the quality of the welds is the one obtained in compliance with the UNI-EN ISO 3834 standard.

For details on the qualifications, types and processes of welding and the certifications of the Welding Coordinator and operators for NDT controls, visit the ACTIVITIES ‘& gt; WELDING section

FUCINA ITALIA holds the “ SOA ” certificate of qualification for the execution of public works in the categories and classes described below

Category Class Description
OG 9 IV-bis Plants for the production of electricity
OG 10 II Plants for high / medium voltage transformation and for the distribution of electricity in alternating and direct current and public lighting systems
OG11 II Technological systems
OS4 V Electromechanical conveyor systems
OS18 A VII Structural steel components
OS30 II Internal electrical, telephone, radiotelephone and television systems
OS31 II Implants for suspended mobility

FUCINA ITALIA has been subjected to evaluation by the Competition and Market Authority for attribution of the Legality Rating obtaining the following score ★★★ . </ Strong >

The company was included in the White List following the evaluation of the Prefecture of Livorno Territorial Office of the Government; the entry is for “Supply of wrought iron”.

Aspetto fondamentale per FUCINA ITALIA è il rispetto e la tutela dell’ ambiente, delle persone ed un’ attenzione particolare è rivolta al sistema di gestione della Salute e Sicurezza; intenzioni rispettate e formalizzate con l’ acquisizione delle certificazioni UNI-EN ISO 14001 e UNI-EN ISO 45001

La saldatura è una delle attività più importanti per i settori in cui operiamo (strutture in acciaio, macchine ed attrezzature di sollevamento e movimentazione, recipienti in pressione, caldareria, decommissioning e stoccaggio materiale radioattivo) ed è quindi una delle fasi della produzione maggiormente regolamentata e controllata. Il certificato relativo alla qualità delle saldature è quello ottenuto in conformità alla norma UNI-EN ISO 3834.

Per i dettagli sulle qualifiche, i tipi ed i processi di saldature e le certificazioni del Welding Coordinator e degli operatori per i controlli CND visitare la sezione ATTIVITÀ’>SALDATURA

FUCINA ITALIA possiede l’attestato di qualificazione all’esecuzione di lavori pubblici “SOA” nelle categorie e classi descritte di seguito

Categoria Classe Descrizione
OG 9 V Impianti per la produzione di energia elettrica
OG 10 II Impianti per la trasformazione alta/media tensione e per la distribuzione di energia elettrica in corrente alternata e continua ed impianti di pubblica illuminazione
OG11 II Impianti tecnologici
OS4 V Impianti elettromeccanici trasportatori
OS18 A VII Componenti strutturali in acciaio
OS30 II Impianti interni elettrici, telefonici, radiotelefonici e televisivi
OS31 III-BIS Impianti per la mobilità sospesa

 

FUCINA ITALIA è stata sottoposta a valutazione dall’Autorità garante della Concorrenza e del Mercato per attribuzione del Rating di legalità ottenendo  il seguente punteggio ★★★.

L’azienda è stata inserita nella White List a seguito della valutazione della Prefettura di Livorno Ufficio Territoriale del Governo; l’inserimento è per “Fornitura di ferro lavorato” .

YOUR SATISFACTION IS OUR MISSION

Our main customers:

SPECIAL STEELS TERNI SpA

ANSALDO ENERGIA SpA

ANSALDO NUCLEARE SpA

C.STEINWEG GROUP

INTERFORCEMENT CENTER FOR MILITARY APPLICATIONS (CISAM)

ENEL SpA

ENI SpA

FINCANTIERI SpA

FONDERIE MORA SpA

G2 OCEAN AS

HUNTSMAN TIOXIDE

KLINGENBERG GROUP Srl

MARTERNERI SpA

NUCLECO SpA

ORANO (formerly AREVA)

PAUL WURTH ITALIA SpA

SAGA WELCO AS

SAIPEM SpA

SECA ENERGIA

SOGIN SpA

VENATOR

Professional roles:

Project Manager

reporting directly to the General Manager, he collaborates with the Commercial Office for the preparation of tenders and offers, taking care of the technical and economic aspects. Within the Technical Office he deals with the management of assigned orders both in terms of coordination of the technical part and in terms of the economic part and interface with the customer; in particular, from the analysis of the contract, it provides for the detailed planning of the activities and the related documentation (Project Charter, Project Management Plan, WBS, Gantt Diagram)., the operational management of projects with relative control of times, costs and quality, the preparation of the documentation relating to the State of Work Progress and the management of the technical contract documentation

educational qualification
Degree in mechanical or management engineering, including three years

requirements for the role
Previous experience in the management of orders in the metalworking sector

Excellent knowledge of the Microsoft Office suite

Knowledge of Project Management principles

Knowledge of mechanical design is a preferential requirement.

Mechanical

reporting directly to the Head of the Workshop, deals with the mechanical assembly and assembly of industrial machines, mechanical maintenance, mechanical testing, also with reference to the hydraulic part

educational qualification
High school diploma

requirements for the role
Knowledge of mechanical drawing

Ability to use bench tools

Ability to use cutters and lathes

Experience in the management of numerical control machines.

Mechanical designer

directly reporting to the Head of Design, within the Technical Office, using 2D and 3D CAD software, it carries out construction drawings even of complex parts by defining dimensions, dimensions, materials, tolerances and updates the related bill of materials. It constantly reports the progress of the work to the Design Manager and the Project Manager of the order. It interfaces with the Production Manager, supporting his activities to ensure the correct progress of the work and with the Purchasing Office for procurement.

educational qualification
High school diploma

 

requirements for the role
Good knowledge of mechanical sizing and ability to use 2d / 3d software (eg Autocad and Solidworks)

Previous experience in the role is a preferential requirement.

Are interested? Fill out the form to apply:

    Name and Surname (Required)

    E-Mail Address (Required)

    Mobile Number (Required)

    Application position (Required)

    Attach Curriculum Vitae (Required)

    Exclusively in non-editable format and with explicit authorization for processing of personal data

    Message (Optional)

    I accept the terms and conditions described in our Privacy & Policy [/ acceptance]

    Privacy Preference Center